25m Electric Trimaran

Business class cabin


0kg CO2


< 3.5 year payback


< 50% of the cost/mile. *


*capital and operating costs over 10 years, compared to outboard powered 14m monohull

The first impression your guests receive is not in the lobby. It's the vessel that brings them to your door.

A 25m electric trimaran built for resort operators who need comfort, reliability, and zero-emission operation in real-world conditions.

55 nm range
20 knots cruise
32 passengers
2.5 m Hs operations
Zero emissions

Full technical specifications, cost model, and operational comparison included in the brochure. Hybrid option available for longer range routes.





Guest Experience

The transfer becomes the first moment of the experience.

Business-class seating, climate control, a quiet and smooth ride, no diesel exhaust, and no vibration through the hull.

Guests judge the resort before they reach it.
The vessel is the first room.
Business-class seating 32 passenger layout
Climate-controlled cabin Business class comfort
Near-silent arrival No vibration or noise
Zero emissions No diesel exhaust
Luggage & access checked luggage aND boarding ramp

Your transfer vessel isn’t just carrying
passengers. It’s carrying room revenue.

Two constraints take competitors off the water:
sea state and access to charging.
Neither stops the Silura 25.

Operates when others cancel

Outboard vessels and foilers are limited to 1.5 m Hs.

Three independent propulsion systems / no single point of failure

The Trimaran configured Silura 25 operates comfortably in 2.5 m Hs — without slamming or instability.

More operating days. Fewer cancellations.

Charging architecture for your duty cycle

Marine DC fast-charge for multi-rotation routes — 75-100-minute turnaround between trips.

AC overnight for short-route operations: lower vessel and shore-side cost.

45 m² of integrated solar PV offsets hotel loads. Shore infrastructure specification included with every vessel.

Most transfer-fleet failures aren't vessel failures.

They're operating-day failures and charging-infrastructure failures.

The Silura 25 is engineered around both.

Economic Case

A commercial decision, not just a technical one.

The Silura 25 is designed around the operating economics that matter: cost per passenger, service reliability, reduced maintenance, and more usable operating days across real resort transfer routes.

$16.15/pax /voyage
*Basis: capital plus 10-year operating cost, divided by total passengers transferred. Utilisation: 3 rotations/day × 300 days/year for Silura; 250 days/year for outboard and foiler reflecting cancellations above 1.5 m Hs. 50 nm route.
Petrol monohull $37.95
Electric foiler $47.18
Silura trimaran $16.15
Payback in three and a half years. Against petrol monohulls, driven by fuel savings alone. Against foilers, the advantage is immediate.
Over 1,000 tonnes of CO₂ avoided annually. A zero-emission transfer platform aligned with premium resort sustainability requirements.
Maintenance measured in years, not hours. No diesel servicing, no injector services, no exhaust corrosion, and fewer moving parts.
Download Brochure

See the full technical and commercial overview.

Download the full Silura 25 overview, including the complete vessel specification, operational comparison, propulsion system breakdown, layout details, and cost model.

  • Complete vessel specifications
  • Detailed cost model and payback analysis
  • Operational comparison with outboards and foilers
  • Engineering and propulsion breakdown
  • Layouts and system diagrams

Download the SILURA overview.

Submit your details to receive the brochure and full commercial overview.

We’ll send the full brochure and may follow up with relevant information. No spam.

For Resort Operators

Purpose-built for resort transfer operations.

Silura is designed for premium island-transfer routes where guest comfort, operating reliability, and commercial flexibility matter.

Flexible acquisition

  • Direct purchase
  • Bareboat charter
  • Operate-and-maintain contract options
  • Single vessel or multi-vessel fleet placement
  • Shore charging infrastructure consultation — DC or AC overnight
  • Diesel-hybrid long range variant available

Built and delivered

  • Built by AsOne Yachts in Thailand
  • 15-month delivery from contract
  • Designed for tropical island-transfer markets
  • Operational across routes such as the Andaman Sea, Gulf of Thailand, the Caribbean, Red Sea and Maldives atoll corridor

Built to operate where others cancel. Built to earn where others bleed.

Contact Us
Contact

Let’s build the future of island transfer.

Talk to us about your route, operating conditions, charging access, and fleet requirements.

Start the conversation.

Submit your details and we’ll come back to you with route suitability, commercial options, and next steps.

We’ll review your enquiry and respond with relevant information. No spam.